News
Project stories, buyer guides and company updates — newest first.
FOB, CFR or CIF — Which Terms Should You Choose for a Steel Building Shipment?
FOB, CFR and CIF decide who books the ship, who carries the risk at sea, and where your quoted price stops. What each term really means for a steel building shipment — and which one fits you.

What Decides the Price of a Prefabricated Steel Building
Two steel buildings with the same floor area can differ in price by a third or more — and both prices can be honest. The seven factors that decide what a prefabricated steel building really costs.

How to Request a Quotation for a Steel Building — What to Send
What a steel building supplier actually needs from you to quote properly — location, use, dimensions, drawings, roof and wall choices, doors, and your project stage.
Steel Rice Storage Warehouse in Guatemala — 9,000 m² Multi-Span Portal Frame Building (2024)
A 9,000 m² multi-span rice storage warehouse supplied to Guatemala in 2024 — planned around heavy rainfall, with special waterproofing for the roof and wall system.

Steel Warehouse in Mexico — 9,000 m² Prefabricated Steel Building (2020)
A 9,000 m² prefabricated steel warehouse supplied to Mexico in 2020 — 598 tonnes of structural steel, delivered as a complete package for on-site assembly.

Steel Warehouse in Brazil — 5,000 m² Prefabricated Steel Building (2023)
A multi-span warehouse for a growing distributor: why dividing the width into connected spans is the economical way to build big.

Steel Basketball Court in Bolivia — 1,000 m² Indoor Sports Hall (2022)
Clear-span space and clear height set by the game — with ventilation, daylight and acoustics planned in, not added later.

No stories in this category yet — check back soon.
